Friday, June 4, 2010

Kitchen Progress

Door, Door Frame, and Casing Installed (Need Painting)
Baseboards Installed and Painted (pre-paint in picture)
Toe kick cut to fit and Knobs Installed (still waiting on drawer pulls)
Finished painting above sink
https://mail.google.com/mail/?ui=2&ik=bc5d81b65e&view=att&th=128fa40ab3125325&attid=0.2&disp=inline&realattid=f_g9yl0pqa1&zw
 Fridge Panel Installed and Last Cabinet Hung
https://mail.google.com/mail/?ui=2&ik=bc5d81b65e&view=att&th=128fa40ab3125325&attid=0.1&disp=inline&realattid=f_g9yl0jmt0&zw